Ros Roca

[av_heading heading=’ROS ROCA / BIFFA’ tag=’h2′ color=” style=” padding=’10’]

[av_one_third first]
[av_image src=’https://arlosh.com/wp-content/uploads/2013/04/RosRoca.png’ attachment=’3215′ align=’center’ animation=’no-animation’ link=’manually,http://www.rosroca.com/’ target=”]

[av_hr class=’default’ height=’50’ shadow=’no-shadow’ position=’center’]

[av_image src=’https://arlosh.com/wp-content/uploads/2014/01/Biffa.png’ attachment=’3199′ align=’center’ animation=’no-animation’ link=’manually,http://www.biffa.co.uk/’ target=”]
[/av_one_third]

[av_two_third]

[av_iconlist position=’left’]
[av_iconlist_item title=’Project’ link=” linktarget=” icon=’43’ font=’entypo-fontello’]
Poplars Anaerobic Digestion Facility, Cannock, Staffordshire, UK
[/av_iconlist_item]
[av_iconlist_item title=’Value’ link=” linktarget=” icon=’ue8c5′ font=’entypo-fontello’]
£24m
[/av_iconlist_item]
[av_iconlist_item title=’Our Role’ link=” linktarget=” icon=’ue855′ font=’entypo-fontello’]
The Biffa managed Poplars facility is the largest AD plant in the UK. Our client, Ros Roca Envirotec, wanted a project partner that could provide a comprehensive package of support.

We worked closely with Ros Roca (and Biffa) to understand the needs of the end user to produce site and process graphics that featured in both an operation & maintenance manual and on-site project training materials and accompanying programme.

Our graphics are now used on site to aid navigation and operator understanding and our manual & on-site training were praised for their effectiveness in promoting project handover.
[/av_iconlist_item]
[/av_iconlist]

[/av_two_third]