Imtech

[av_heading heading=’IMTECH / WELSH WATER’ tag=’h2′ color=” style=” padding=’10’]

[av_one_third first]
[av_image src=’https://arlosh.com/wp-content/uploads/2013/04/Imtech_MSz.png’ attachment=’3222′ align=’center’ animation=’no-animation’ link=’manually,http://imtech.com/EN’ target=”]

[av_hr class=’default’ height=’50’ shadow=’no-shadow’ position=’center’]

[av_image src=’https://arlosh.com/wp-content/uploads/2014/01/Welsh_Water.png’ attachment=’3208′ align=’center’ animation=’no-animation’ link=’manually,http://www.dwrcymru.com/’ target=”]
[/av_one_third]

[av_two_third]

[av_iconlist position=’left’]
[av_iconlist_item title=’Project’ link=” linktarget=” icon=’43’ font=’entypo-fontello’]
Cardiff & Afan Advanced Anaerobic Digestion Plants, Cardiff & Port Talbot, UK
[/av_iconlist_item]
[av_iconlist_item title=’Value’ link=” linktarget=” icon=’ue8c5′ font=’entypo-fontello’]
£38m – Cardiff, £30m – Afan
[/av_iconlist_item]
[av_iconlist_item title=’Our Role’ link=” linktarget=” icon=’ue855′ font=’entypo-fontello’]
We enjoy a strong working relationship with Imtech, having supported them on approximately 30 contracts of varying size and nature.

Working with them at Cardiff & Afan we produced site and process graphics, operation & maintenance manuals and facilitated on-site project handover training.

To ensure a smooth transition from contractor to operator we developed and delivered a 20 day training programme, leveraging the use of our industry-leading graphics to explain processes employed on site.